Fall project - Levenwick
Finished
October 1, 2011
November 5, 2011

Fall project - Levenwick

Project info
Levenwick by Gudrun Johnston
Knitting
SweaterCardigan
me
M
Needles & yarn
Cascade Yarns ® Cascade 220®
6966
Gray
WEBS - America's Yarn Store in Northampton, Massachusetts
Notes

Ever since I finished my KAL cardi I’ve been itching to knit another sweater for myself. I have this silver-grey Cascade wool that I thought would be good for teh Rocky Coast….not so. So now I am trying this pattern.

1 Oct- swatched, works out perfectly with 4.25mm needles. Started on the collar. Got stuck on the 4th row. Something does not make sense. Took me an hour to figure out that I was actually doing the repeats in the wrong order. Hope this is not an indication of things to come.

2 Oct- Collar looks great, I’ve started on the increases. Never heard of Invisible purl increase. Googled it. Not much info out there, tried a few things, seems to work. Moving on.

UPDATE- I wrote up a tutorial on the invisible purl increase, with pics and all, check it our here:

http://schatzi-knits.blogspot.ca/2012/08/levenwick-myster...

3 Oct- I think I am doing the increases correctly, seems to look the same as in the picture. can’t decide if I like the way it looks, but I’m going to keep going.

7 Oct- Starting on the Body Increase portion of cardigan. This is actually going a lot faster then I thought!

8 Oct- Something is wrong, I have too many stitches, I must have misunderstood the instructions somehow. It’s an hour later, and I finally got it, The body increase row is only for sizes M and up, I thought I had to repeat 4 times, when in fact I only have to knit it once…I hate wasting time like this… Ripped out 8 rows, am back where I was this morning!

9 Oct- divided arms from the rest of the body, this is starting to look like a cardi. Tried putting it on…I am always paranoid it won’t fit. Even though I did knit the gauge and everything. Hard to tell.

10 Oct- Working on the Body decrease rows.

19 Oct- Body almost done. Put project aside for a bit to work on my Herringbone cowl.

23 Oct- Body finished, one sleeve as well’ just started working on the second sleeve.

27 Oct- second sleeve finished and left front band as well. Need to start thinking of buttons.

29Oct- Right front band finished, had a little trouble with the buttonholes, but weathered that storm as well.

30Oct- Wow, three needle bind-off is quite the nifty trick, looks great

31 Oct- started the bottom hem, got side-tracked by The Iron chef…

1 Nov- OMG I finished! Now on to find buttons and blocking!!!
I really like the way it looks and feels. The armpits crease a bit, but I am hoping that blocking will fix that.

viewed 494 times | helped 2 people
Finished
October 1, 2011
November 5, 2011
 
About this pattern
1679 projects, in 4099 queues
KNITulescu's overall rating
KNITulescu's clarity rating
KNITulescu's difficulty rating
About this yarn
by Cascade Yarns ®
Worsted
100% Wool
220 yards / 100 grams

194760 projects

stashed 107069 times

KNITulescu's star rating
  • Project created: October 1, 2011
  • Finished: November 6, 2011
  • Updated: September 17, 2014
  • Progress updates: 5 updates