Chiara's special birthday
Finished
May 11, 2012
May 29, 2012

Chiara's special birthday

Project info
Spiral Throw by Lion Brand Yarn
Knitting
BlanketThrow
sister Chiara
one size
Needles & yarn
US 8 - 5.0 mm
3,152 yards = 16 skeins
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
67443
Yellow
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
67931
Yellow-orange
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
41941
Yellow-orange
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
67472
Red-orange
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
67489
Red
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
67443
Red-purple
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
54118
Pink
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
68140
Red-purple
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
44823
Red-purple
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
45109
Purple
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
45108
Blue
Jo Ann, Newington , NH
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
68140
Blue-green
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
44463
Green
Jo Ann, Newington, NH
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
1 skein = 197.0 yards (180.1 meters), 85 grams
44121
Green
www.joann.com
May 2012
Lion Brand Wool Ease Solids, Heathers, Twists
2 skeins = 394.0 yards (360.3 meters), 170 grams
42269
Brown
www.joann.com
May 2012
Notes

Waiting for yarn to arrive…website says May 10th….
May 11, 2012: cast on for this before it gets too warm. It is a fairly easy projects and I like the way the square rotates while I work. But it is still early, I am on my third color…
May 12th: I tie the knots on the right of the work, so I remember when to start the new row. Onto 5th color!
May 14th: changed on to 40 inch circulars and color 7…
May 15th: I had to get Addi Turbo 40 inch circulars because with Denise interchangeable stitches were not moving well round the cord, a real pain.Started color 8.
May 21st: 12th color! Getting bigger and back to Denise interchangeable….
May 24th : finished the 14th color, onto the 15th and last!the last few rows were really slow and I kept dragging the huge thing around the house just hoping to finish it…..
Note 1: I finished Avocado and Forest Green Heather before the end of the last row in those colors. I substituted with the following color: it’s really a matter of not much left. The last color too was used up almost to the end of the second ball.
Note 2: I used for the increases the knit(or purl) front and back instead of the recommended because the latter was more time consuming. Result is ok but the proposed would have probably been neater.
May 26th: finished knitting but I need to block it. Not tonight!
May 29th: I finally managed to block it and it takes almost all of my Queen size bed…

viewed 81 times
Finished
May 11, 2012
May 29, 2012
About this pattern
280 projects, in 505 queues
flocbmsm's overall rating
flocbmsm's clarity rating
flocbmsm's difficulty rating
About this yarn
by Lion Brand
Worsted
80% Acrylic, 20% Wool
197 yards / 85 grams

108195 projects

stashed 46433 times

flocbmsm's star rating
  • Originally queued: May 4, 2012
  • Project created: May 11, 2012
  • Finished: May 29, 2012
  • Updated: February 22, 2020
  • Progress updates: 10 updates