Pike's Mitts
by Jared Flood
patterns >
Knit Local
> Pike's Mitts
![](https://images4-g.ravelrycache.com/uploads/brooklyntweed/81141870/JJF_0051_copy_thumbnail.jpg)
![](https://images4-g.ravelrycache.com/uploads/brooklyntweed/81141870/JJF_0051_copy_small2.jpg)
© Jared Flood/Brooklyn Tweed
![](https://images4-g.ravelrycache.com/uploads/brooklyntweed/81141817/JJF_0040_copy_small2.jpg)
© Jared Flood/Brooklyn Tweed
![](https://images4-g.ravelrycache.com/uploads/brooklyntweed/81141840/JJF_0045_copy_small2.jpg)
© Jared Flood/Brooklyn Tweed
Pike's Mitts
by Jared Flood
ERRATA
The following errors were present in the first printing of the book:
1.) On Left Mitt, at the end the page it has:
Next (dec) Rnd: :K4, k2tog, k8 – 40 stitches:
The instructions should be written “K4,k2tog, k8; repeat from * to the end of round. – 40 sts
2.) In the Stitch Glossary, the 6-st RC symbol is defined incorrectly:
What is written: “Sl 2 sts to first cn and hold to back, sl next 2 sts to 2nd cn and hold to front, k2tbl, k2 tbl from 2nd cn, k2 tbl from first cn.”
What should be written: “Sl 2 sts to first cn and hold to back, sl next 2 sts to 2nd cn and hold to back, k2tbl, k2 tbl from 2nd cn, k2 tbl from first cn.”
About this yarn
by Brooklyn Tweed
Worsted
100% Targhee-Columbia
140 yards
/
50
grams
34881 projects
stashed
21660 times
rating
of
4.4
from
6039 votes
More from Jared Flood
- First published: November 2011
- Page created: November 14, 2011
- Last updated: May 28, 2012 …
- visits in the last 24 hours
- visitors right now