patterns > amirisu > My Fair Isle Journey
> Skerries
Skerries
Yarn
A Jamieson’s Spindrift 105 Eesit (Ecru)
B Jamieson’s Spindrift 108 Moorit (Brown)
C Jamieson’s Spindrift 182 Buttercup (Yellow)
D Jamieson’s Spindrift 1140 Granny Smith (Light green)
E Jamieson’s Spindrift 815 Ivy (Green)
F Jamieson’s Spindrift 688 Mermaid (Blue Green)
G Jamieson’s Spindrift 135 Surf (Light blue)
Yarn Requirement / 必要糸量 (balls / 玉)
Size 1(2,3,4) (5, 6, 7, 8) =
A 3(3, 3, 3) (4, 4, 5, 5)
B 6(7, 7, 8) (9, 10, 11, 12)
C 3(3, 4, 4) (4, 5, 5, 6)
D 3(3, 3, 4) (4, 5, 5, 5)
E 2(2, 2, 2) (2, 2, 3, 3)
F 1(1, 1, 1) (1, 1, 1, 1)
G 3(4, 4, 4) (5, 5, 6, 6)
Needles
A US 3 (3.0 mm) 32” / 80 cm circular needle
A US 2 (2.75 mm) 32” / 80 cm circular needle
Or, needles required to obtain gauge
Gauge (after blocking)
34 stitches & 36 rounds = 4” / 10 cm in pattern stitch with US 3 (3.0 mm) needle.
Sizes
Finished chest circumference: 1 (2, 3, 4) (5, 6, 7, 8) = 33½ (37, 41, 44½) (48, 52, 55½, 59)” / 85 (94, 104, 113) (122, 132, 141, 150) cm
The sample is in size 2 on a 5’ 5” / 166 cm tall model with 6” / 15 cm on positive ease at bust.
Tools
Stitch markers (4), tapestry needle, waste yarn, a spare circular needle or crochet hook, scissors
Note
A sweater worked in the round with steeks for armholes and neck opening. 2x2 ribbing for hem is worked first, and then body is worked in the round throughout by adding steeks at where armholes and neck opening are planned. Steeks for armholes are cut to pick up stitches to work sleeves, and last steek is cut to work neckband in 2x2 ribbing.
After cleaning steek edges, finishing process is proceeded.
Needles
1×US 3 (3.25 mm) 80 cmの輪針
1×US 2 (2.75 mm) 80 cmの輪針
またはゲージの取れる太さの針
Gauge (ブロッキング後)
US3の針を使用し模様編みで34目 & 36周 = 10 cm
Sizes
出来上がり寸法: 胸囲1 (2, 3, 4) (5, 6, 7, 8) = 85 (94, 104, 113) (122, 132, 141, 150) cm
サイズ2のサンプルを身長166 cmのモデルが余裕15 cmで着用
Tools
目数マーカー(4), 綴じ針, 別糸, 予備の輪針もしくは5号かぎ針, ハサミ
Note
袖ぐり, 襟ぐりのために後から切り開くスティークを入れながら輪で編むセーター. 最初に裾の2目ゴム編みを編み, 袖ぐりと襟ぐりの部分にスティークを入れながら輪で編んでいく. 袖のスティークを切り開き, 目を拾って編み出す. 襟ぐりのスティークを切り開き, 休み目とスティーク部分の目を拾って2目ゴム編みする. それぞれのスティークの処理をした後に仕上げを行う
29523 projects
stashed 51414 times
- First published: June 2024
- Page created: May 8, 2024
- Last updated: May 9, 2024 …
- visits in the last 24 hours
- visitors right now