Finished size: 59” wide x 27” long.
175 rows / 289 stitches.
8 days to knit.
I will also be using size 6 Silver Lined Transparent Montana Blue Round Japanese Seed Beads from FusionBeads.com (#SB2751) for the majority of the shawl and size 6 Gold Permanent Galvanized Round Japanese seed beads (#SB3035) for part of Clue 6.
7/1/14
Clue 1:
Setup, rows 1-14 (73 sts)
Pattern: rows 1-16 (141 sts)
Totals for Clue 1: This clue took 1 hour 24 minutes, used .16oz/5g/23yds of yarn, and 17 blue beads, about 4” long.
Clue 2:
Pattern: rows 1-34 (273 sts)
This clue took 3 hrs 16 minutes, used .67oz/19g/87.4 yds of yarn, about 8.5” long thru this clue.
Cumulative totals thru Clue 2: 4 hrs 40 mins; .83oz/24g/110.4yds
7/2/14
Clue 3:
Pattern: rows 1-25 (228 sts, 100 blue beads)
This clue took 4 hrs 7 minutes, used .9oz/26g/120.6 yds of yarn, about 12” long thru this clue.
Cumulative totals thru Clue 3: 8 hrs 47 mins, 1.73oz/50g/231 yds (1 skein used thru this clue)
7/3/14
Clue 4, #1, Rows 1-16 (278 sts)
7/4/14
Clue 4 #2, rows 1-16 (278 sts)
7/5/14
Clue 4, rows 17-21 (281 sts)
This clue took 5 hrs 49 mins, used 1.27 oz/36g/166 yds of yarn; about 15.5” long thru this clue.
Cumulative totals thru Clue 4: 14 hrs 36 mins, 3 oz/86g/397 yds
Clue 5 #1, rows 1-12 (281 sts, 69 blue beads)
7/6/14
Clue 5 #2, rows 1-12 (281 sts, 69 blue beads)
7/7/14
Clue 5 Transition rows 1-4 (289 sts)
This clue took 4 hrs 48 mins, used 0.8 oz/23g/106.5 yds; 138 beads; about 19” long through this clue.
Cumulative totals thru Clue 5: 19hrs 24 mins, 3.8oz/109 g/503.25 yds
Clue 6 rows 1-20 (289 sts, 19 gold beads)
The main part of this clue took 2 hrs 57 mins
7/8/14
Clue 6 Transition rows 1-4 (289 sts, 95 blue beads)
Clue 6 Edging rows 1-5 (289 sts, 57 blue beads)
This part of clue 6 took 2 hours 14 mins because of the heavy beading, used 1.44 oz/41 g/189.5 yds
Cumulative totals for whole shawl: 21 hours 38 mins, 5.24 oz/150g/693g (3 full skeins), 407 blue beads, 19 gold beads
Total weight with beads: 6.5oz/184g