Aug 10/12: I needed a travel project. Started theae socks on the commuter train from Poughkeepsie to NYC. I didn’t get that much done - first time in a LONG time that I do all the driving! Haha.
Aug 12/12: I also worked on them at the theatre while we were waiting for Chicago to start.
Jan 11/13: Finally finished. I made over 20 things since I started these socks. I I would say that 6 months is reasonable in that case?
I love these socks. I can’t wait to wear them!