Old Rebels with Papaya Dreams
Finished
August 20, 2021
October 4, 2021

Old Rebels with Papaya Dreams

Project info
Elton by Joji Locatelli
Knitting
SweaterCardigan
myself
L
Needles & yarn
US 2 - 2.75 mm
US 2½ - 3.0 mm
US 3 - 3.25 mm
US 4 - 3.5 mm
22 stitches and 32 rows = 4 inches
in stockinet
1,053 yards
Das Mondschaf Virgo
5 yards in stash
1.01 skeins = 463.9 yards (424.2 meters), 50 grams
Orange
Das Mondschaf in Oberursel, Hessen
August 11, 2021
Posh Yarn Virginia Sock
325 yards in stash
1.34 skeins = 589.1 yards (538.7 meters), 134 grams
Orange
July 9, 2021
Notes

General
I don’t think hard blocking is something that you should have to do with a stockinet cardigan so my gauge is what I get after an ordinary washing & drying.

Using TECHknitter’s trick for a neater transition from stockinet to ribbing.

Using 3.25mm needles for stockinet & ribbing on body, 3.5 for stockinet on sleeves, 3 for sleeve ribbing, 2.75 for buttonbands & neckband, and 2mm for picking up and knitting stitches.

TCKAL cast-on post: #671

Buttons from YlloTyll.

Mods

  • using GSR (doublestitch) for the shortrows,
  • wanted sleeves a little roomier than on my first Elton so knit one more stripe on back and fronts before joining,
  • knitted body two stripes shorter than my earlier one and made the ribbing the same,
  • for sleeves picked up a stitch in two of every three rows = 74 st, made first decrease on r 16 then decreased every 8 r a total of 12 times = 50 st, knit 8 more rows before starting rib,
  • for buttonbands picked up 3 st for every 4 r = 99 st, knit 6 r rib and bound off in pattern, no buttonholes since my buttons are tiny enough to not need them,
  • picked up 105 st for neckband and knit as buttonband.

Timeline
2021-08-26: Joined fronts and back.
2021-09-07: Finished body and started on right sleeve.
2021-09-11: Finished right sleeve and started on left.
2021-09-19: Finished left sleeve.
2021-09-21: Started on buttonbands.
2021-09-23: Buttonbands finished.
2021-09-30: Started on neckband.
2021-10-04: Finished!!

viewed 291 times | helped 8 people
Finished
August 20, 2021
October 4, 2021
 
About this pattern
from J O J I
3306 projects, in 3125 queues
turloughishere's overall rating
turloughishere's clarity rating
turloughishere's difficulty rating
About this yarn
by Das Mondschaf
Lace
72% Mohair, 28% Silk
460 yards / 50 grams

328 projects

stashed 346 times

turloughishere's star rating
About this yarn
by Posh Yarn
Fingering
70% Merino, 30% Silk
440 yards / 100 grams

192 projects

stashed 536 times

turloughishere's star rating
  • Originally queued: August 11, 2021
  • Project created: August 20, 2021
  • Updated: October 10, 2021
  • Progress updates: 22 updates