Wabi Sabi Sweater
Finished
July 6, 2006
January 17, 2008

Wabi Sabi Sweater

Project info
#13 Central Park Hoodie by Heather Lodinsky
Knitting
SweaterCardigan
me!
large
Needles & yarn
US 7 - 4.5 mm
Kilcarra Aran Tweed
none left in stash
20 skeins = 1760.0 yards (1609.3 meters), 1000 grams
Irish Yarn & Crafts eBay store
Notes

This was my first foray into cables, and initially they gave me fits; turns out I was reading the chart backwards, so all my cables are upside down (hence the name).

I started this on a backpacking trip in summer ‘06, and got it 85% complete by the early fall; now it languishes in the large pile of UFOs in my fiber room. I hate picking up stitches and seaming, which is what is left. Gah!

Pattern Mods: upside down cables (see above) and One Row Buttonholes.

11/4 FINALLY picked up all 316 stitches; left button band complete, right band halfway.

11/5 Did the buttonholes today; took 3 tries, but they look great. Did the one in the pattern & didn’t like it, so switched to the 1-row buttonhole; much better. (This was my 1st project w/ buttonholes).

11/6 Started seaming… (shudder) Note the highfalutin’ clips I used to hold seam together: can you say ‘Dollar Store’?!? Seriously, these work great, they’re just tiny (1/2”) aligator clips for your hair. Work as well as the high-priced clips specifically made for the job, and waaay cheaper.

1/16 Now I have a deadline to finish: meeting Raveler Meggle to knit on 1/18, and we’re both going to wear our finished CPHs. So I took it to Stitch ‘n Bitch tonight, and got another seam done. All that’s left is the sleeves!

1/17 I DID IT! It is no longer the UFO-that-will-not-die, but the FAVE FO! I finished tonight, and I love this sweater. Fits perfectly, comfortable, flattering… I learned lots, and highly recommend it. Can’t wait to wear it tomorrow when I meet Meggle.

1/18 Doh! Meggle had to cancel our knitting date. :( Poor thing, her pooch is under the weather, so she postponed her trip to Humboldt. But I’ll be wearing it tomorrow when I get together to spin.

1/19 DOH! No spinning today. :( So I was gonna wear it to my friend’s bday party tonight, but we didn’t swing a carpool, so didn’t attend. Tomorrow, when I get together with Beth, surely.

1/20 Seriously? Still no occasion to wear it at and get a photo op? Beth didn’t call, I couldn’t reach her, so no knit date today. I’m just gonna take my own picture tomorrow.

1/21 Went ahead and did my own photo shoot. All dressed up with nowhere to go, so I just went into the backyard. Bye CPH!

viewed 604 times
Finished
July 6, 2006
January 17, 2008
 
About this pattern
5395 projects, in 5561 queues
velmalikevelvet's overall rating
velmalikevelvet's clarity rating
velmalikevelvet's difficulty rating
About this yarn
by Kilcarra
Aran
100% Wool
87 yards / 50 grams

1227 projects

stashed 954 times

velmalikevelvet's star rating
  • Project created: October 10, 2007
  • Finished: February 7, 2008
  • Updated: November 9, 2018