6-Month Birthday Jaywalkers
Finished
November 18, 2008
June 9, 2009

6-Month Birthday Jaywalkers

Project info
Jaywalker by Grumperina
Knitting
Feet / LegsSocksMid-calf
me!
I wear US10 shoes
Needles & yarn
US 1 - 2.25 mm
Oldfield Creek Sock & Yarn Hand-Dyed Sock Yarn, 80-20
none left in stash
0.9 skeins = 405.0 yards (370.3 meters)
420
Pink
Oldfield Creek Sock & Yarn eBay Store
Notes

Took me 6 months to knit (hence the name), only finished when I did ‘cuz I wanted to sport ‘em on my 45th birthday.

Wanted to try this pattern since before I started knitting socks - I heard great things, all are true!


6:40pm: DONE! DRESSED! & off to the PARTY!

6:35pm: Oh, shit our ride is here, & I’m still kitchenering!

6:25pm: Time to KUI (kitchener under the influence)!

5:30pm: No shower. But I’m on the toe! Our ride will be here at 6:45!! Will I be done?

4pm: Am realizing I can either a) finish the sock & wear it to the party tonight, or b) take a shower.

3pm: Ok, I am now at exactly the spot I was 3 hrs ago when I found the dropped stitch. Knit on!

Noon: I was almost to the toe, & I just realized I dropped a stitch in the increases about 1.5” back. Crap! Must. Rip. Back. Argh!

6/9: I SO want to wear these on my birthday - TODAY - I will finish them to wear bowling tonight!

6/8: So close to the toe I can almost taste it!

6/3: Almost 2” got knit - WOOT!

5/24: I actually knit a coupla rows while waiting with a friend in the ER.

5/21: I knit exactly 1/4 of one row tonight at Purl ‘n Hurl. Go, Velma! (I am SOOO ready to be done with these damn socks.)

3/26: I discovered last week that when I was knitting on these, I ‘lost’ (not dropped, lost) a stitch somewhere. Took me ‘til yesterday to find the row where I forgot an increase; frogged back about 2.5”, all the way to the heel flap. :( Ready to move forward once again. Gotta say: getting pretty sick of knitting these!

1/11: I haven’t been updating this project, but I’ve been squeezing in a few rows each night. I’m about 4” into the 2nd sock.

1/3: Too Much Coffee Girl, I finished about 2 inches tonight.

1/01/09: All I did on Christmas was the CO row. Little Miss Big Accomplishment! 2 more rows today.

12/25: Finally, time to knit for myself! Casting on #2.

12/15: Sock #2 has been postponed due to holiday knitting deadlines…

12/8: One sock down!

11/25: Finished foot on sock #1. Only the toe is left now!

11/22: Finished leg and heel on sock #1.

11/19: Took ‘em with me on my hike to visit Luna, the redwood that my friend Julia Butterfly occupied for 728 days in 1997/98. I sat inside her and knit, one of the most powerful places I’ve ever pulled out my needles.

11/18: Since the pattern notes mention that gauge is critical, I did my first-ever in-the-round gauge swatch; good thing, too, ‘cuz mine is waaaay off with this yarn on #1 needles. Gonna try it with #2s. Can’t find my #2s, and I like the fabric that was created with the #1s, so I decided to just knit a size bigger than I normally would (so I’m making the 9.75”-ers.)

viewed 299 times
Finished
November 18, 2008
June 9, 2009
 
About this pattern
12423 projects, in 3908 queues
velmalikevelvet's overall rating
velmalikevelvet's clarity rating
velmalikevelvet's difficulty rating
About this yarn
by Oldfield Creek Sock & Yarn
Fingering
80% Wool, 20% Nylon
460 yards / 100 grams

76 projects

stashed 104 times

velmalikevelvet's star rating
  • Project created: November 18, 2008
  • Finished: June 12, 2009
  • Updated: November 23, 2018