Weihnachtsvitamine
Finished
October 12, 2013
November 24, 2013

Weihnachtsvitamine

Project info
Vitamin D by Heidi Kirrmaier
Knitting
SweaterCardigan
Weihnachtspullover-KAL in Deutscher Stricktreff
Domic on ravelry
M2
Needles & yarn
US 4 - 3.5 mm
1,361 yards
Garnstudio DROPS Fabel
none left in stash
2 skeins = 448.0 yards (409.7 meters), 100 grams
Blue
Lanade.de
May 1, 2013
Garnstudio DROPS Fabel
none left in stash
2 skeins = 448.0 yards (409.7 meters), 100 grams
Blue
Lanade.de
Zwerger Garn Opal Vincent van Gogh
none left in stash
1 skein = 465.0 yards (425.2 meters), 100 grams
Blue
Wollparadies in Ettlingen, Baden-Württemberg
December 21, 2012
Notes

Nov 24th
Hm - seems it grew quite a bit in washing- but should be ok, it is more on the roomy side - which explains why I had to use a bit of the grey yarn for the sleeves.

Nov. 23d
Finished second sleeve - just have to weave in ends, sew on buttons and block…

Nov. 20th
Finished first sleeve - had to add a tiny bit of grey as I will probably not have enough yarn otherwise… Picked up 80 stitches for sleeve, did 15 rows plain, then decreased 2 stitches each every 8th row, down to 60 stitches.

Oct 27th
Adding waist striping with yoke yarn.

Oct 20th
Separating Sleeves from the body

Oct. 12th
Cast on again, used the Opal van Gogh for the yoke as planned. Fabric is a little tighter than with the forst one, probably as it is not containing cotton. Like it so far.

There is a Christmas Sweater KAL going on in the Deutscher Stricktreff Group, and I will participate with my second Vitamin D (yeah, we have quite a wiiide definition of what a Christmas Sweater can be…)

When knitting the first (which I like a lot), I loved the yoke construction and had the idea to knit the top part up to the Separation of sleeves with a self-patterning sockyarn I have in stash, combined with blue sockyarn I also have in stash and do not want to use for socks.

I am also thinking about leaving out the short rows and just knit an “ordinary” Cardigan from the sleeves down- but we will see.

First, I have to complete my Karisma-Senfjanker, I hope to be able to start this by middle of October.

Oh, and to prove that the Sweater was completed in time, I will have to post a photo in front of the Christmas tree/ decoration…

viewed 819 times | helped 3 people
Finished
October 12, 2013
November 24, 2013
 
About this pattern
5395 projects, in 6884 queues
Domic's overall rating
Domic's clarity rating
Domic's difficulty rating
About this yarn
by Garnstudio
Fingering
75% Wool, 25% Nylon
224 yards / 50 grams

97566 projects

stashed 52552 times

Domic's star rating
Domic's adjectives for this yarn
  1. solid
  2. hardwearing
About this yarn
by Zwerger Garn
Light Fingering
75% Wool, 25% Nylon
465 yards / 100 grams

3392 projects

stashed 3052 times

Domic's star rating
  • Project created: October 11, 2013
  • Finished: November 30, 2013
  • Updated: December 2, 2013
  • Progress updates: 6 updates