Berenice, sort of
Finished
January 10, 2015
February 15, 2015

Berenice, sort of

Project info
Berenice (For Kids) by Julie Hoover
Knitting
SweaterPullover
me
Needles & yarn
US 4 - 3.5 mm
US 2½ - 3.0 mm
US 0 - 2.0 mm
Botto Poala Coned Yarn Kent
984 yards in stash
0.31 skeins = 3051.2 yards (2790.0 meters), 310 grams
Brown
lanaset
October 6, 2014
Notes

I don’t follow the pattern precisely, use it only as an inspiration.

18.01.2015:

Gauge with yarn held double (after washing):

26 sts & 42 rounds = 10 cm in reverse stockinette stitch.

11 sts = 4 + 3 +4 = 31 mm in cable pattern.

14 sts = 4 + 3 + 4 + 3 = 39 mm in cable pattern.

20 sts = 69 mm in lace pattern.

23.01.2015

Provisional cast on 174 sts (back - 55 sts, sleeves - 16 sts each, front - 87 sts).

Anatomical raglan.

35 Shadow Wrap Short-Rows at the beginning of the yoke on 3 mm needles. After that back is 85 sts, front is 93 sts, sleeves are 30 sts each.

Switched to 3.5 mm needles.

26.01.2015:

The yoke is completed (94 rows total, including shortened rows at the beginning). Back is 117 sts, front is 125 sts, sleeves are 72 sts each. Divided yoke stitches for body and sleeves, adding 13 stitches at each underarm.

30.01.2015:

Undid provisional cast on.
6 rounds of double knitting on 2 mm needles (decreased 14 sts in the first round, 320 sts = (174 - 14) x 2);
12 rounds of 2 x 2 ribbing on 3 mm needles;
tubular cast off on 2 mm needles.

08.02.2015:

Body:

Increased 4 sts in every 28th round 4 times.

Traveling cables:

front: shift to the center 7 times in every 10th round, shift from the center once in 14th round and 5 times in every 7th round.

back: shift to the center 9 times in every 7th round, shift from the center once in 14th round and 7 times in every 7th round.

Hem: 6 rounds of double knitting (2 mm needles), 12 rounds of 2 x 2 ribbing (3 mm needles), 6 rounds of double knitting, tubular cast off (2 mm needles).

09.02.2015:

Picked up stitches for the left sleeve (72+14+2=88 sts) using this method of preventing holes at the underarms.

12.02.2015:

Completed the left sleeve. Picked up stitches for the right sleeve.

15.02.2015:

Finished.

viewed 1920 times | helped 15 people
Finished
January 10, 2015
February 15, 2015
 
About this pattern
396 projects, in 599 queues
Nusenka's overall rating
Nusenka's clarity rating
Nusenka's difficulty rating
About this yarn
by Botto Poala Coned Yarn
Lace
100% Merino
9843 yards / 1000 grams

58 projects

stashed 38 times

Nusenka's star rating
  • Project created: January 10, 2015
  • Finished: February 15, 2015
  • Updated: August 28, 2015
  • Progress updates: 6 updates