Shearing Stopover
Finished
April 30, 2017
May 21, 2017

Shearing Stopover

Project info
Stopover by Mary Jane Mucklestone
Knitting
SweaterPullover
me
44
Needles & yarn
US 9 - 5.5 mm
US 10½ - 6.5 mm
763 yards = 7 skeins
Ístex Léttlopi
5 skeins = 545.0 yards (498.3 meters), 250 grams
9340
Gray
Marji's Yarncrafts in Granby, Connecticut
April 25, 2017
Ístex Léttlopi
1 skein = 109.0 yards (99.7 meters), 50 grams
9051
Red
Marji's Yarncrafts in Granby, Connecticut
April 25, 2017
Ístex Léttlopi
1 skein = 109.0 yards (99.7 meters), 50 grams
8649
Blue
Marji's Yarncrafts in Granby, Connecticut
April 25, 2017
Notes

Making this to wear to Nash Island for shearing. I’m going to knit as fast as I can in order to finish it on time!

May 1, 2017

Because my cardi version of this was sooo small (I still don’t know why!), I decided to go up to the L and aim for a cozy sweatshirt version.

Finished the hem color work and plan to get the body knit by Sunday.

May 4, 2017

Day 4 and I’m at 7.5”, decreases for waist shaping are done.

May 5, 2017

I did the increase rounds and knit to about 10”. I have a busy day ahead on Saturday , but it will end at our friends’ lean to and fire pit, so I should get in some good straightforward knitting time! On track to start sleeves on Monday!

May 7, 2017

Last night (well, technically, this morning, 1:15 a.m.) I reached 14”. I wonder if I should knit one more inch. I’ll think on it while I knit the sleeves.

I dug out my dpns for the sleeves and will aim to get both cast on and cuffs done tonight. If I make good progress on end-of-semester grading.

May 7, 2017

I thought I would get both sleeves cast on and cuffs done, but grading was a beast. I cast on one, didn’t finish the cuff. Still on track, though.

May 9, 2017

Last night I took a break from grading to finish the color work on cuff 1 and I knit 1/6 increase repeats. I’m making size M sleeves, and once I join the sleeves & body, I’ll decrease to size M. I have smallish shoulders, and I don’t want a loose fit there.

I’m estimating that I should have sleeve 1 done on Thursday and sleeve 2 on Sunday.

May 10, 2017

I was on fire with Sleeve 1 last night! Since I did a lot of grading during the day, I had more evening time to knit. I got through all of the increase rounds and the sleeve measures just under 12”. I’m glad I’m making the M sleeve--I love the way it fits pre-blocking. I think I can finish sleeve 1 today and make good progress on sleeve 2. Dare I hope I can join the body and sleeves on Sunday??? Stay tuned!

May 11, 2017

I finished Sleeve 1 last night but was too tired to start Sleeve 2. I’ll work on it tonight!

May 12, 2017

Last night I cast on Sleeve 2 and knit 4.5”.

May 13, 2017

We went out last night, so I knit when I got home, but I only had one set of increases in me…9 rounds knit. Tonight I’ll aim for finishing increases and possibly the sleeve.

May 14, 2017

I finished the Sleeve 2 increases and a few inches beyond last night. This afternoon I completed Sleeve 2!

I’ll join the sleeves and body later today, and I’ll also need to do some thinking and figuring out. I want to knit the remainder of the sweater in size M as I like the shoulder/neck fit on my cardi in that size. I also want to add some short rows to the back to raise the neck a wee bit.

This tutorial from Interweave may help with the short rows. And here’s how to do German short rows.

May 15, 2017

Last night I did the join. Decided against using the size M for the rest of it. Knit about 1.5” of the 3” before decreases. Today should be my last day of grading--plan if I get it all done is to knit through at least half of the decrease section.

May 16, 2017

Last night I knit the first decrease. I decided to stop and consider the short rows today to avoid a late-night mess up.

May 17, 2017

I followed budaknit (person)’s short row noteslink text and at 12:30 a.m., as the last episode of Anne with an E ended, I panicked and thought I the short rows were in the wrong place. In the light of morning, though and with the sweater stretched out on the table, I think it’s all going to be just fine. I have one more round & decrease before I start the colorwork.

May 18, 2017

Last night I finished the decrease round and started color work, getting 1/3 done with the chart. This morning, I sat in the car while waiting for Neal at an appointment. It was in the 80s early in the day--not the best lopi-knitting weather! But I got another 1/3 of color work done. It’s our 10th anniversary, in the mid-90s now, and poor N is wiped out from the last few days. So we’re laying low on the celebrations…and I may just finish up the knitting today!

May 19, 2017

I finished the knitting last night! It was so hot, well into the night, but I persisted knitting lopi. I have to weave in ends and join the underarms…and then blocking magic! I’m going to order the yellow I want for the pop color.

May 20, 2017

Last night I wove in all the ends. I kitchner stitched one underarm only to discover I did it with right sides facing when it ought to be wrong sides. So I un-did the kitchner stitching. Will try again tonight or tomorrow. This baby will be blocking by Monday!

May 21, 2017

I grafted the underarms. Tomorrow I’ll block, and when my yellow yarn arrives, I’ll duplicate stitch the motif centers. Still, I’m calling this done!

viewed 118 times
Finished
April 30, 2017
May 21, 2017
 
About this pattern
1071 projects, in 965 queues
PoMoGolightly's overall rating
PoMoGolightly's clarity rating
PoMoGolightly's difficulty rating
About this yarn
by Ístex
Aran
100% Icelandic
109 yards / 50 grams

58453 projects

stashed 55608 times

PoMoGolightly's star rating
  • Originally queued: April 14, 2017
  • Project created: May 1, 2017
  • Finished: May 21, 2017
  • Updated: February 28, 2019
  • Progress updates: 9 updates