SM11: Baa, Boing Boing, Cluck Cluck
Finished
April 23, 2017
May 3, 2017

SM11: Baa, Boing Boing, Cluck Cluck

Project info
Lambs and Chickens and Bunnies, Oh My! by Ros Clarke
Knitting
Feet / LegsSocksMid-calf
Me
Needles & yarn
US 0 - 2.0 mm
US 000 - 1.5 mm
Cascade Yarns ® Heritage®
240 yards in stash
0.41 skeins = 179.2 yards (163.8 meters), 41 grams
Gray
Circle of Stitches in Salem, Massachusetts
November 29, 2016
Cascade Yarns ® Heritage®
122 yards in stash
0.06 skeins = 26.2 yards (24.0 meters), 6 grams
10179
Purple
Circle of Stitches in Salem, Massachusetts
January 17, 2016
Unplanned Peacock Studio Peacock Sock
115 yards in stash
Blue
Unplanned Peacock Studio
Unplanned Peacock Studio Peacock Sock
74 yards in stash
0.06 skeins = 27.6 yards (6.3 meters), 6 grams
Yellow-orange
Unplanned Peacock Studio
Unplanned Peacock Studio Peacock Sock
97 yards in stash
0.04 skeins = 18.4 yards (16.8 meters), 4 grams
Green
Unplanned Peacock Studio
Unplanned Peacock Studio Peacock Sock
115 yards in stash
Orange
Unplanned Peacock Studio
Unplanned Peacock Studio Peacock Sock
115 yards in stash
Green
Unplanned Peacock Studio
Unplanned Peacock Studio Peacock Sock
115 yards in stash
Blue
Unplanned Peacock Studio
Notes

Pattern Gauge:
Colorwork: 9spi 11rpi; St st: 8spi 12rpi on US1(2.5mm)

Yarn Starting wts:
A: UPP Firebird (vari) - 26g
B: Cascade Dark Plum - 101g
C: UPP Kestrel - 26g
D: UPP Olive (dk green) - 25g
E: UPP Rainbow Blue - 27g
F: UPP Grass - 25g
MC: Cascade Charcoal - 99g

Gauge swatch (St st followed by Colorwork)
US0 (2mm)
Uncut: C - 10.5spi 10.75rpi; S - 8spi 10.5rpi
Cut + Dry: C - 9spi 11rpi; S - 7.5spi 10.5rpi
Cut and Wet Pinned: C - 8spi 11rpi; S - 7spi 9.5rpi

Swatch amts:
B: Cascade Dark Plum - 98g rem (3g used)
MC: Cascade Charcoal - 98g rem (1g used)

04-23-2017

Cuff, Ribbing and leg done up until beginning of Chickees…Colorwork is going a bit faster than I’d thought it would. Not looking forward to weaving all the tails in tired_faceconfounded

Leg is snug - gauge measures at 8.5spi 11rpi

04-24-2017

Leg after Chart - 2 rounds on US0, then switched to US000 for the remainder of foot

04-26-2017

27 rows to end of gusset decreases = 3.25”
Foot gauge - 8spi 12rpi on US000

Put lifeline in on R42

04-27-2017

Would have finished closer to normal bedtime…but alas I was coming up at least an inch short for actual fit and maybe 1.5 inches short for competition minimum….so toe got frogged.

50 rounds of foot (US000) -- Foot Chart + 3 rows of St st (US0) -- Toe (US000) (Fun Fact: toe took 30m)

Finished Sock #1 3:30a

A: UPP Firebird (vari) - 23g rem (3g used)
B: Cascade Dark Plum - 95g rem (6g used)
C: UPP Kestrel - 24g rem (2g used)
D: UPP Olive (dk green) - 21g rem (4g used)
E: UPP Rainbow Blue - 23g rem (2g used)
F: UPP Grass - 23g rem (2g used)
MC: Cascade Charcoal - 78g rem (21g used)

Sock #1 - 41g (includes markers and tab

04-30-2017

2nd Leg is done…will I make a spot for the next round? (4 days 17 hours to go)

05-01-2017

Heel and Gusset done…but alas still not speedy enough to make the cut. Roster has filled with 4 days and 9 hours to go. Now to finish these at leisure and do sock surgery for the other pairs from previous rounds.

05-02-2017

firebird 20g rem
kestrel 21g rem
grass 21g rem
rainbow blue 20g rem
olive 18g rem
dark plum 92g rem before foot sheep

05-03-2017

All the knitting is done! Still beat the countdown, but spots are already all filled.

Need to weave in all the ends tired_face

viewed 22 times
Finished
April 23, 2017
May 3, 2017
 
About this pattern
549 projects, in 184 queues
QtMousie's overall rating
QtMousie's clarity rating
QtMousie's difficulty rating
About this yarn
by Cascade Yarns ®
Fingering
75% Merino, 25% Nylon
437 yards / 100 grams

86949 projects

stashed 64963 times

QtMousie's star rating
About this yarn
by Unplanned Peacock Studio
Light Fingering
75% Merino, 25% Nylon
460 yards / 100 grams

951 projects

stashed 996 times

QtMousie's star rating
  • Project created: April 22, 2017
  • Finished: May 5, 2017
  • Updated: March 18, 2018
  • Progress updates: 4 updates