Pattern Gauge:
Colorwork: 9spi 11rpi; St st: 8spi 12rpi on US1(2.5mm)
Yarn Starting wts:
A: UPP Firebird (vari) - 26g
B: Cascade Dark Plum - 101g
C: UPP Kestrel - 26g
D: UPP Olive (dk green) - 25g
E: UPP Rainbow Blue - 27g
F: UPP Grass - 25g
MC: Cascade Charcoal - 99g
Gauge swatch (St st followed by Colorwork)
US0 (2mm)
Uncut: C - 10.5spi 10.75rpi; S - 8spi 10.5rpi
Cut + Dry: C - 9spi 11rpi; S - 7.5spi 10.5rpi
Cut and Wet Pinned: C - 8spi 11rpi; S - 7spi 9.5rpi
Swatch amts:
B: Cascade Dark Plum - 98g rem (3g used)
MC: Cascade Charcoal - 98g rem (1g used)
04-23-2017
Cuff, Ribbing and leg done up until beginning of Chickees…Colorwork is going a bit faster than I’d thought it would. Not looking forward to weaving all the tails in
Leg is snug - gauge measures at 8.5spi 11rpi
04-24-2017
Leg after Chart - 2 rounds on US0, then switched to US000 for the remainder of foot
04-26-2017
27 rows to end of gusset decreases = 3.25”
Foot gauge - 8spi 12rpi on US000
Put lifeline in on R42
04-27-2017
Would have finished closer to normal bedtime…but alas I was coming up at least an inch short for actual fit and maybe 1.5 inches short for competition minimum….so toe got frogged.
50 rounds of foot (US000) -- Foot Chart + 3 rows of St st (US0) -- Toe (US000) (Fun Fact: toe took 30m)
Finished Sock #1 3:30a
A: UPP Firebird (vari) - 23g rem (3g used)
B: Cascade Dark Plum - 95g rem (6g used)
C: UPP Kestrel - 24g rem (2g used)
D: UPP Olive (dk green) - 21g rem (4g used)
E: UPP Rainbow Blue - 23g rem (2g used)
F: UPP Grass - 23g rem (2g used)
MC: Cascade Charcoal - 78g rem (21g used)
Sock #1 - 41g (includes markers and tab
04-30-2017
2nd Leg is done…will I make a spot for the next round? (4 days 17 hours to go)
05-01-2017
Heel and Gusset done…but alas still not speedy enough to make the cut. Roster has filled with 4 days and 9 hours to go. Now to finish these at leisure and do sock surgery for the other pairs from previous rounds.
05-02-2017
firebird 20g rem
kestrel 21g rem
grass 21g rem
rainbow blue 20g rem
olive 18g rem
dark plum 92g rem before foot sheep
05-03-2017
All the knitting is done! Still beat the countdown, but spots are already all filled.
Need to weave in all the ends