Flax Light
Finished
October 16, 2021
November 23, 2021

Flax Light

Project info
Flax sock by tincanknits
Knitting
SweaterPullover
Libby (2 years old)
2-4 yrs
Needles & yarn
US 0 - 2.0 mm
US 3 - 3.25 mm
24 stitches and 32 rows = 4 inches
in stockinette using larger needles
Knit Picks Stroll Fingering Tonal
1.25 skeins = 577.5 yards (528.1 meters), 125 grams
Notes

Took about 28 hrs and 600 yds of yarn.

Intention: Make sweater dress. Use basic lace from Rosa around raglan shoulders and at bottom of dress.

Lesson learned

  • Stop making Christmas gifts that weren’t asked for. Seriously. I could’ve used this time for a present for myself that I know I’d love, and instead I’m pouring it into something that might not be worn. Gift cards or other bought presents show love too.

Oct 16 - 3 hrs 5 mins. Halfway done with yoke.
Oct 17 - 3 hrs 5 mins. Haha, perfectly on gauge despite not swatching. Nice. Done with yoke. Total 6h10m.
Oct 19 - 30 mins. Backwards loop cast on is horribly fiddly and I hate it. I hope it looks good. In other words, past the sleeve separation. I’ll work an inch or two of the body, then work the sleeves to be sure I don’t run out of yarn. Total 6h40m.
Oct 20 - 1 hr. Guess is about 10 more hours of knitting. Total 7h40m.
Oct 21 - 35 mins. 8h15m.
Oct 22 - 40 mins. 8h55m.
Oct 23 - 2 hrs 20 mins. Total 11h15m.
Oct 25 - 30 mins. Total 11h45m.
Oct 26 - 20 mins. Total 12h5m.
Oct 27 - 50 mins. 8” down from armholes. Still tons of yarn left. Total 12h55m.
Oct 29 - 1 hr. I can’t decide if I want a 1x1 twisted rib hem, or a faced hem…. Total 13h55m.
Oct 30 - 1 hr. Total 14h55m.
Oct 31 - 1 hr 25 mins. WAG of another 5 hours left. Decided to do a faced hem. Total 16h20m.
Nov 3 - 55 mins. End is in sight. Total 17h15m.
Nov 5 - 20 mins. Total 17h35m.
Nov 7 - 30 mins. Total 18h5m.
Nov 8 - 40 mins. Gosh kitchener takes forever with a long tail. Total 18h45m.
Nov 9 - 1 hr 5 mins. Still kitchener. Total 19h50m.
Nov 15 - 1 hr 25 mins. Done with kitchener and 7% done with the sleeves. Total 21h15m.
Nov 16 - 55 mins. Total 22h10m.
Nov 17 - 50 mins. Total 23h.
Nov 18 - 40 mins. Total 23h40m.
Nov 19 - 1 hr 40 mins. Total 25h20m.
Nov 20 - 45 mins. Total 26h5m.
Nov 21 - 1 hr 20 mins. Knitting DONE. Just need to weave in ends. Total 27h25m.
Nov 23 - 20 mins. Done. What a beast! I like it though. Total 27h45m.

viewed 23 times
Finished
October 16, 2021
November 23, 2021
About this pattern
14791 projects, in 6489 queues
Sforzando's overall rating
Sforzando's clarity rating
Sforzando's difficulty rating
About this yarn
by Knit Picks
Light Fingering
75% Merino, 25% Nylon
462 yards / 100 grams

38684 projects

stashed 28067 times

Sforzando's star rating
  • Originally queued: October 6, 2021
  • Project created: October 16, 2021
  • Finished: November 23, 2021
  • Updated: December 10, 2021
  • Progress updates: 7 updates