Pre-washed the yarn with some Dawn detergent and hot water.
SWAG on time to complete: 50 hours.
Oct 16 - 45 mins. Set up rows complete.
Oct 17 - 1h50m. Gauge is about correct; around 4.5” for 2 repeats (but very stretchy), and 1” in height for one repeat. The fact that the pattern gives UNBLOCKED gauge (?!?!) makes me think my unblocked gauge should be A-Ok. Total 2h35m.
Oct 19 - 1h20m. Total 3h55m.
Oct 22 - 1h20m. Total 5h15m.
Oct 28 - 2h5m. Total 7h20m.
Oct 29 - 2h50m. Total 10h10m.
Oct 30 - 50m. Total 11h.
Nov 1 - 1h20m. Total 12h20m.
Nov 2 - 1h. Total 13h20m.
Nov 3 - 1h40m. Total 15h.
Nov 4 - 1h55m. Total 16h55m.
Nov 5 - 1h40m. Attached 2nd skein. Total 18h35m.
Nov 6 - 40m. Total 19h15m.
Nov 7 - 40m. Total 19h55m.
Nov 9 - 1h10m. Blocked what I had. Gauge measures exactly as the pattern calls for, with room to block “slightly” larger if needed. Also, turns out I did the larger provisional cast on wrong, so I need to cut the chain every few stitches. Noooooooo…. Sigh. Total 21h5m.
Nov 10 - 1h25m. Arms sewn up, and waist/shoulder band almost complete. Total 22h30m.
Nov 11 - 3h40m. Total 26h10m.
Nov 12 - 55m. Total 27h5m.
Nov 13 - 1h25m. Total 28h30m.
Nov 14 - 20m. Total 28h50m.
Nov 15 - 45m. Total 29h35m.
Nov 18 - 40m. Total 30h15m.
Nov 24 - 50m. Total 30h55m.
Nov 25 - 2h45m. Total 33h40m.
Nov 26 - 3h50m. End of 2nd hank. Total 37h30m.
Jan 1 - 1h15m. Total 38h45m.
Jan 3 - 35m. Total 39h20m.
Jan 6 - 1h50m. Total 41h10m.
Jan 7 - 2h. Done with lace section. Total 43h10m.
Jan 8 - 30m. Total 43h40m.
Jan 9 - 1h15m. Total 44h55m.
Jan 10 - 1h40m. Done with knitting. Just a few more ends to weave in. Total 46h35m.
Jan 12 - 15m. All done! Total 46h50m.