Indulgence
80 hr estimate
- Took about 95 hours to complete.
Using very simple teeth from Lily’s Diamonds example here https://russianfibers.blogspot.com/2013/02/diamonds-part-...
Knitting the bottom teeth ribbon first, and continuing knitting it as I go. From what I gather, the grafted method is more traditional for lace weight, but I’d really like to try the make-as-I-go method. It just seems simpler. Plus I have no idea how it works.
105 stitches to start… tooth repeat is 16 sts, +3 for first tooth,-1 for last tooth. So,
105 = ((x * 16) +3 -1) / 2
x = 13
so I think I’ll be making 13 teeth for the bottom row… or is it 14, with half a tooth on either side? Nah, let’s go with 13. I want a double row of eyelets in the teeth too. Planning on 3 large diamonds.
Mar 7 - 35 mins. Finished 1 tooth! I restarted 3 times… forgot I wanted a double row of eyelets, then messed up the number of cast on stitches twice. Ha. This will be fun!
Mar 8 - 3h40m. All 13 teeth done, picked up the long flat edge & cast-on edge and (RS) knit across (skipping the cast-on edge for the first pass), which turns the right corner of the teeth edging. (WS) Knit across the body and right-side edge again (staying in pattern for edging), then (RS) knit the right-side edging and row 3 of the body, and knit into the cast-on stitches I had picked up earlier (staying in pattern for the edging), which completes the corner turn on the left-side edging. From here, it’ll just be continuing the body and working the edging all in one piece, at least until I get to the top. Not sure what to do there, but I have ideas. Total 4h15m.
Mar 9 - 25 mins. Finished body row 7. Only about 757 and the top teeth to go. :) Current pace estimate is 88 hours. Total 4h40m.
Mar 10 - 1h45m. Finished body row 23/764. Total 6h25m.
Mar 11 - 1h40m. Finished body row 36/764 (about 8% of the stole done in total). Total 8h5m.
Mar 12 - 3h50m. I had knit a bunch… only to realize my right side had become my wrong side some 16+ rows back. How? I accidentally skipped row 28, that’s how. Ugh. Frogged/tinked back to row 27, starting again from here. Finished 29/764. Total 11h55m.
Mar 13 - 1h25m. Finished 42/764. Total 13h20m.
Mar 14 - 50m. Finished 49/764. Total 14h10m.
Mar 16 - 1h15m. Finished 59/764. Total 15h25m.
Mar 17 - 1h10m. Finished 70/764. Total 16h35m. About 12.5% done, which means about 130 total estimated hours at this pace.
Mar 18 - 50 mins. Too tipsy to keep gauge any further, so quitting for tonight. Finished 75/764. Total 17h25m.
Mar 20 - 1h. Finished 84/764. Total 18h25m.
Mar 22 - 1h. Finished 91/764. All done with the trees! Total 19h25m.
Mar 23 - 3h20m. Fixed several small mistakes. Finished 115/764. Total 22h45m.
Mar 24 - 2h15m. Major surgery on the central diamond - I had shifted the outer wall inward by 1 stitch on the left side almost at the beginning. It was highly visible…once I stopped to take a look at it. Oops. Outer wall’s all good now, buuuut there’s a stitch on the inside that I don’t like the look of. Finished 123/764. Total 25h.
Mar 25 - 1h20m. Completely fixed the center panel. Finished 131/764. Total 26h20m.
Mar 26 - 1h50m. If I stopped making mistakes, that’d be great. Central panel is actually fixed this time. Gosh. It looks so pretty now though. 135/764. Total 28h10m.
Mar 27 - 2h5m. Finished 154/764. Total 30h15m.
Mar 28 - 2h15m. Finished 172/764. About 25% done. Total 32h30m.
Mar 29 - 1h. Finished 180/764. Total 33h30m.
Apr 1 - 1h35m. Finished 193/764. Total 35h5m.
Apr 4 - 1h10m. Finished 201/764. Past the halfway point of the first diamond. Total 36h15m.
Apr 6 - 30 mins. Total 36h45m.
Apr 7 - 1h5m. Finished 213/764. Total 37h50m.
Apr 8 - 1h15m. Finished 222/764. Total 39h5m.
Apr 9 - 25m. Finished 226/764. Total 39h30m.
Apr 10 - 2h5m. Finished 245/764. Total 41h35m.
Apr 11 - 40m. Finished 252/764. Finished 1st hank of yarn. Total 42h15m.
Apr 12 - 1h10m. Finished 262/764. Total 43h25m.
Apr 13 - 2h45m. Finished 284/764. Total 46h10m.
Apr 14 - 2h45m. Finished 308/764. Past the first diamond. Total 48h55m.
Apr 15 - 55m. Finished 317/764. Total 49h50m.
Apr 16 - 1h30m. Finished 332/764. Total 51h20m.
Apr 17 - 1h5m. Finished 345/764. Total 52h25m.
Apr 18 - 55m. Finished 356/764. Total 53h20m.
Apr 19 - 55m. Finished 366/764. Total 54h15m.
Apr 20 - 1h15m. Finished 380/764. 5 rows to go til the halfway point! Total 55h30m. Current pace estimate is 91 hours total.
Apr 23 - 2h40m. Finished 406/764. Past the halfway point! 65% of the way done with the middle diamond. Total 58h10m.
Apr 24 - 1h55m. Finished 426/764. Total 60h5m.
Apr 25 - 55m. Finished 436/764. Total 61h.
Apr 26 - 1h25m. Finished 452/764. Total 62h25m.
Apr 27 - 40m. Finished 460/764. Total 63h5m.
Apr 28 - 1h25m. Finished 480/764. Total 64h30m.
Apr 29 - 40m. Finished (480+294-292)/764, so 482/764. Past the second diamond now. Total 65h10m.
Apr 30 - 2h30m. Noticed a small mistake in row counting on part 5. There’s accidentally another 2-- just before row 301, so what looks like row 301 is actually row 303. So there are 766 total rows for 3 diamonds. Finished 514/766. Second skein ran out. Total 67h40m.
May 2 - 1h25m. Finished 529/766. Total 69h5m.
May 3 - 2h50m. Finished 560/766. Total 71h55m.
May 4 - 2h15m. Finished 586/766. Past the halfway point of the last diamond. Total 74h10m.
May 5 - 2h5m. Finished 608/766. Total 76h15m.
May 7 - 3h5m. Finished 642/766. Total 79h20m.
May 8 - 2h5m. Finished 667/766. Total 81h25m.
May 9 - 40m. Finished 674/766. Total 82h5m.
May 10 - 1h45m. That row error also happens at 400 and 500. :) So total rows for 3 diamonds are 574 + 3(2) + 192 = 772. Current row would be: (amount + 2(number of times skipped a row) + 484) - 292. Finished 500 + 4 + 484 - 292, or 696/772. Total 83h50m.
May 11 - 45m. Finished 703/772. Total 84h35m.
May 15 - 1h50m. Finished 724/772. Total 86h25m.
May 16 - 55m. Finished 734/772. Total 87h20m.
May 17 - 25m. Hands feel a little wrecked from yardwork today. :/ Finished 738/772. Total 87h45m.
May 18 - 1h. Finished 750/772. Total 88h45m.
May 20 - 50m. Finished 760/772. This ball of yarn ran out. :( Total 89h35m.
May 21 - 45 mins. Finished 768/772. Total 90h20m.
May 22 - 1h35m. Finished 774/774 (needed 2 extra rows for teeth to match up on the edges), and 5/13 teeth done on top. Total 91h55m.
May 23 - 2h. Finished all knitting. Attempted Russian grafting, but I started from the wrong end. Recovered my stitches (somewhat), but will need to fix some of them and try again tomorrow. Total 93h55m.
May 24 - 40m. All finished! Ends woven in and everything. Total 94h35m.