To go with Butterick 6217 version A in yellow/pink floral cotton/poly burnout
Butterick 6217 alterations:
- 1.25” FBA
- armhole deepened 3/8”
- 1.5” added to sleeve caps for poof
- buttonholes re-spaced, 8 instead of 7
- back cut on the fold
- take up shoulders 1” f/b
Skirt (Original pattern/My project)
- Cast on: 80 sts / 96 sts
- Button band: 720 sts / 864 sts
- Panels: 1,976 sts each / 2,456 sts each
- Buttonhole band: 1,129 sts / 1,344 sts
- Total skirt (18p, no wb): 37,497 sts / 46,512 sts
- My waistband: 1,715 sts
Grand total of 48,227 stitches in my skirt
06-02-2016
Blouse finished
06-12-2016
CO 96
Worked button band and 8 rows of skirt panel
06-19-2016
16 rows of box stitch = 18g
Full panel (16 +short row flare) = 28g
Which means:
button band = 9g
Buttonhole band = 18g
Approx 17 panels = 476g
Total skirt = 503g
Each ball yarn = 113g
503/113 = 4.45 balls needed (have 3, need 2 more)
Extra .55 ball will be used for waistband.
06-19-2016
Ball 1: button band, 3 panels, 14 rows of fourth panel
06-21-2016
Ball 2: rest of 4th panel, panels 5-7, 13 rows of panel 8
06-24-2016
Ball 3: rest of 8th panel, panels 9-11, 11 rows of panel 12
07-05-2016
Ball 4: rest of 12th panel, panels 13-15, 9 rows of panel 16
07-06-2016
Worked to 16 panels, seemed to fit. Worked buttonhole band and bound off.
Waistband: Leaving last BO stitch on needle, turn work, pick up and knit each slipped stitch (140 stitches pu + 1 stitch from BO = 141)
Work in seed stitch for 5 rows, slipping first stitch and knitting last.
Buttonhole row 1: Sl, patt2, BO2, patt to end.
Buttonhole row 2: Sl, patt to BO sts, CO2, patt to end.
Sl, Work in patt 45sts, cdd, patt45, cdd, patt to end.
Work 2 more rows in patt.
BO in pattern.
Welp, that’s too small. Rip back to row before buttonholes on skirt.
07-07-2016
Added 2 more panels (18 total) and reworked buttonhole band.
Picked up stitches for waistband, 157 this time.
07-08-2016
Worked waistband, needed 6th skein for last 20ish stitches in last row and for bind off.
Waist 33.5” unstretched
Hem 73”