MS L5 shawl
Finished
October 27, 2024
December 17, 2024

MS L5 shawl

Tester project info
Diamonds and Flowers
Knitting
Needles & yarn
MS L5 yarn
1 skein = 360.9 yards (330.0 meters), 92 grams
Seascell for L5 final project
0 skeins
Notes

26-08-2024

28 hrs of knitting in total
Semicircular shawl
Bamboo/angora/nylon

25-11-2024

Had to change the yarn, I’m not supposed to use any animal protein fibre for this project. Switched to 100% bamboo handspun from the Fiber Imp handpainted top.

27-11-2024

Using 3 or 3.5 mm needles.
Just COed the sts and started writhing up the pattern.
Planning the design and thinking through the knitting way took approximately 1.5 hrs (included in knitting time in stopwatch).

27-11-2024

17 min

01-12-2024

2 hrs 55 min into knitting, 36 rows done

02-12-2024

Bamboo fibre handspun yarn was chosen for this project because it is suitable for shawls - silky, drapy, lustrous. From my previous experience with bamboo I know I enjoy both spinning and knitting it.
90 g bamboo top braid is a good weight for spinning to make enough heavy-lace-weight yarn for a small/medium size shawl.
In order to be practical and use up as much spun yarn the best pattern would be the one knitted top-down until all the yarn is used up.
The shawl is planned to be lace-patterned. That type of knitting works best with the solid and gradient colours. Chain plying was chosen to avoid heathered effect which can often happen with multicoloured braid spinning if plying from multiple bobbins.
Approximately 1.5 hrs was used to decide on the shawl shape, knitting needles size (no swatches were made, the decision on needle size was based on previous bamboo fibre spinning and shawl knitting experience, and looking up previously knitted shawls), stitch/pattern choice, and creating a pattern sketch.

03-12-2024

6 hrs 04 min
68 rows done, 74 g left

03-12-2024

7:48, 82 rows

04-12-2024

10:20, 98 rows

05-12-2024

11:37, 108 rows

08-12-2024

should I add 2 hrs to the project time if that wasn’nt knitting but a mistake fixing?

08-12-2024

12: 12, 112 rows, 48 g of yarn left
13:05 118 rows, 43 g left
(6 rows 5 g of yarn)

09-12-2024

14:14 126 rows, 35 g left
14:37 128 rows

10-12-2024

16:40 140 rows (aproximately 13 min a row)

10-12-2024

18:27 148 rows, 13 g left

11-12-2024

19:47 154 rows, one row takes approximately 4 dining table lengths

11-12-2024

22:49 the colourful part is done!

15-12-2024

Started knitting the edging.
7 min 300 sec - one point
There are 40 points in the edging and a few short rows to establish the pattern.
Approximately 5 hrs - 5 hrs 10 min to complete the edging.

16-12-2024

70 live sts left,
31.5 points knitted

17-12-2024

finished knitting!!!

viewed 22 times
Finished
October 27, 2024
December 17, 2024
About this pattern
Personal pattern (not in Ravelry)
  • Project created: August 26, 2024
  • Finished: December 21, 2024
  • Updated: December 23, 2024
  • Progress updates: 3 updates