Back to the Beach bags I
Finished
August 20, 2021
November 7, 2021

Back to the Beach bags I

Project info
200-1 Back to the Beach by DROPS design
Crochet
BagMarket bag (slouchy)
my friends
Hooks & yarn
4.0 mm (G)
998 yards
Garnstudio DROPS Paris
136 yards in stash
4.52 skeins = 370.7 yards (339.0 meters), 226 grams
4270
Ganella
June 13, 2021
Garnstudio DROPS Paris
249 yards in stash
1.88 skeins = 154.2 yards (141.0 meters), 94 grams
4223
Ganella
June 13, 2021
Garnstudio DROPS Paris
18 yards in stash
1.78 skeins = 146.0 yards (133.5 meters), 89 grams
3070
Ganella
June 13, 2021
Garnstudio DROPS Paris
none left in stash
2 skeins = 164.0 yards (150.0 meters), 100 grams
0131
Ganella
June 13, 2021
Garnstudio DROPS Paris Recycled Denim
none left in stash
2 skeins = 164.0 yards (150.0 meters), 100 grams
701
Ganella
June 13, 2021
Notes

29-08-2021

Bag I/1
101 Light Blue 100 g
17 Off White 69 g
41 Mustard 35 g

02-10-2021

Bag I/3
35 Vanilla 89 g
17 Off White 80 g
41 Mustard 31 g
I have skipped the patter in 1st round and chained 114 stitches directly (without the reduction from 142 chain stitches). This saved a lot of yarn and also, I found that unnecessary as the edge does not have to be flexible.

18-10-2021

Bag I/2
59 Light Old Pink 100 g
17 Off White 77 g
41 Mustard 28 g
I have skipped the patter in 1st round and chained 114 stitches directly (without the reduction from 142 chain stitches). This saved a lot of yarn and also, I found that unnecessary as the edge does not have to be flexible.

09-11-2021

Second project (different colors):
https://www.ravelry.com/projects/kaderus/200-1-back-to-the-beach

viewed 62 times
Finished
August 20, 2021
November 7, 2021
About this pattern
100 projects, in 164 queues
kaderus' overall rating
kaderus' clarity rating
kaderus' difficulty rating
About this yarn
by Garnstudio
Aran
100% Cotton
82 yards / 50 grams

20316 projects

stashed 18793 times

kaderus' star rating
About this yarn
by Garnstudio
Aran
100% Cotton
82 yards / 50 grams

1475 projects

stashed 1203 times

kaderus' star rating
  • Originally queued: June 1, 2021
  • Project created: August 28, 2021
  • Finished: November 7, 2021
  • Updated: January 11, 2022
  • Progress updates: 7 updates