Trail Point Hat #2
Finished
January 18, 2023
November 12, 2024

Trail Point Hat #2

Project info
Trail Point by Ruth Boelkins
Knitting
HatBeanie, Toque
Needles & yarn
US 3 - 3.25 mm
US 5 - 3.75 mm
Plied Yarns North Ave Bobbins
Plied Yarns North Ave Bobbins
Gray
Plied Yarns North Ave Bobbins
Multicolored
Plied Yarns North Ave Bobbins
Notes

Second Trail Point for the Mr. Making it stripe the same as the first.

The brim is a fold over. To get the stripe blocking you need to use almost the entire bobbin from the 3rd stripe (top of hat) to cast on and knit about 1.5 inches. Switch to stripe one color and knit both bobbins and fold over brim connection.

I changed my mind - was going to have Redline as the top stripe but only used it for the under side of brim. Added in The Gateway for the top stripe. It’s the same top stripe as the first hat.

viewed 14 times
Finished
January 18, 2023
November 12, 2024
About this pattern
39 projects, in 33 queues
karmeni's overall rating
karmeni's clarity rating
karmeni's difficulty rating
About this yarn
by Plied Yarns
Fingering
100% Wool
35 yards / 8 grams

81 projects

stashed 222 times

karmeni's star rating
  • Project created: January 19, 2023
  • Updated: November 12, 2024
  • Progress updates: 2 updates