Pea Pod, the Kayak
Finished
August 1, 2022
August 2, 2022

Pea Pod, the Kayak

Project info
Pea Pod by Amanda Berry
Knitting
Food
Evelyn
Needles & yarn
US 6 - 4.0 mm
US 7 - 4.5 mm
Brown Sheep Lamb's Pride Worsted
10 yards in stash
0.8 skeins = 152.0 yards (139.0 meters), 90 grams
047
Pink
Tawas Bay Yarn Co., Inc. in East Tawas, Michigan
June 27, 2022
Notes

Finding no knitting patterns for a kayak here on Rav, and because my granddaughter has requested a knitted kayak for a 5 inch stuffed animal (a wolverine) who apparently needs one, I am going to try to convert this peapod into a kayak. The wolverine says it wants a bright pink kayak. Sheepie is trying out the kayak, awaiting the arrival of Evelyn and her wolverine.

My mods: I knit 2 peapods, in this beefy worsted yarn--one on size 7 US and one on size 6. I followed the pattern through Row 12, which takes the stitch count to 15. I continued the same increases until I reached 33 stitches. For the middle section where there are no increases, I knit 36 rows instead of 18. After that, I followed the same pattern of two centered decreases on each right side row until I got down to 5 stitches and then I bound off. (Not working the rows of stockinette at the very end.)

I wet-blocked both pieces.

First I sewed the larger piece together into a kayak shape. Then I sewed the smaller piece together the same way--slipping the smaller one into the larger one to give the kayak more firmness. It wasn’t firm enough, so I added in some polyfill between the layers.

The paddle shaft is I-cord with a plastic straw stuffed inside.

I adapted Meg Swansen’s Baby Bear Ribwarmer pattern for use as PFD/life jacket. Here’s some details on my adaptation.

viewed 77 times
Finished
August 1, 2022
August 2, 2022
 
About this pattern
31 projects, in 59 queues
noreen1009's overall rating
noreen1009's clarity rating
noreen1009's difficulty rating
About this yarn
by Brown Sheep
Aran
85% Wool, 15% Mohair
190 yards / 113 grams

55213 projects

stashed 35893 times

noreen1009's star rating
  • Project created: July 24, 2022
  • Finished: August 2, 2022
  • Updated: September 26, 2022
  • Progress updates: 2 updates