20100716- done & kitchenered. Shadow stole the rest of the yarn. Will weight but I probably about used 1.5 (.75 each)
20100714- almost finished with toes!
20100706- started left foot chart, still in gusset decreases.
20100701- about halfway done with leg. WOOT!
20100629- finished cuff started leg chart.
20100628- decided since it’s SOS I should work on these. Almost done with cuff.
20100510- finished right foot chart. stopped there for now so i can finish both toes at same time. seems to be my foot size & CO for left foot. (ok, technically i cast on for the left cuff)
20100504,am- after ignoring for most of march and all of april started working on this again. In middle of foot somewhere.
20100209, am- turned heel. hopefully will pu & start gusset on train home.
20100208, am- after only 11 rounds of pattern decided it to be heel flap time. need more coffee before i recount to see if i really can count to 28 and 32, respectively.
20100204, pm- dentist was delayed so I knit more. should measure. everyone at that office luves them. :)
20100204, am- very slowly growing as I haven’t knit much on them. not sure if it’s trying different circ configs or my insane schedule. i’ve only finished 8 repeats and it’s about 3.5”
20100126, am- knit 1.25 repeats during commute. not looking forward to that sluggish pace. wondering if it’s the 9”circ (which i’m oddly loving)
20100125, am- finished cuff. Ready to start pattern. Need to decide if I’m knitting left or right first. Using the 9” Hiya-Hiya I acquired through special order at LBYS
20100123- CO & knit 3 rows. hope i don’t get striping like others have. Can’t believe I’m actually going to knit this top down.. one at a time! with a flap!