Post up! http://radcraftingcollective.com/fo-friday-rowe/
09-06-2016
Seriously wtf is up with my row gauge?
Pattern gauge:
Double moss stitch, post blocking: 19stx30row = 4x4”
32 st panel Chart A or C, post blocking: 32stx30row = 5x4”
My gauge:
Double moss stitch, post blocking: 20stx20row = 4x4”
32 st panel Chart A, post blocking: 32stx20row = 5x4”
Team MyRowGaugeIsStupid reporting for duty.
Swatched again with US6 and it’s near perfect. 18.5x32 on double moss. It was perfect pre-blocking, funny enough. Just means I won’t necessarily have to block a ton. woo.
09-25-2016
Exciting Saturday night / Sunday morning of swatching complete.
US6 is going to be my going forward needle. My gauge with US6 turned out to be ~17x28 on moss, ~27x30 on cables.
Math will have to be done, but the row gauge is much better and so it’s just a choice of sizing to make up for the difference on stitch gauge.
9-27-2016
Did the tubular cast on at the end of the workday. Literally only got the first 4 setup rows done, it was different from my normal tubular but it looks nice. Wouldn’t do it again on another project, but it was good.
10-03-2016
Finished the Right Front today.
On hold until Lilli Pilli is done :)
Total days worked: 4
10-10-2016
Picked up again after lunch.
Total days worked: 4.5
10-11-2016
Finished the first skein today. Ended on row 34 of the 3rd pattern repeat on the left front. 40 more rows and left front will join the finished right front.
Total time worked: 40 hours.
10-12-2016
Total time worked: 41 hrs - both fronts done.
10-14-2016
Total time worked: 51 hours.
2/3 done with the sleeve increases. They are 17” long.
10-20-2016
Total time worked: 55.5 hours.
Sleeve increases done. Started cap shaping on left sleeve.
10-24-2016
Total time worked: 61 hours
10 rows left of ribbing and then it’s cabletime on the back. Whee.
10-28-2016
Total time worked: 75 hours
Back piece done.
11-02-2016
Total time worked: 88.5 hours
EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE
I AM NEVER TAKING THIS OFF.